Route Determination in SAP
The route is the transport channel of an outbound delivery from the delivering plant to the ship-to party. It can consist of more than one section and has a beginning point and an end point.
This route can be used to define the actual transit time (period in which the goods are being transported) and the lead time for transportation planning. The route is normally determined for each document item in the sales document. The automatic default value can be changed manually at a later date, if you wish to have alternative routes.
Determining the Rote Automatically
The SAP system tries to determine a route for every item to be delivered. The SAP system uses four separate points as search keys for determining the route automatically Normally this data is defined in master records and in Customizing:
• the departure zone in Customizing for the shipping point
• the shipping condition in the sales and distribution-specific data for the sold-to party (View: Shipping)
• the transportation group in the sales and distribution-specific data for the material (View: SD: General/Plant)
• the transportation zone in the ship-to party general data
Route is determined automatically in the sales order based on:
- Departure zone or country of the delivering plant.
- Destination zone or country of the Ship to Party.
- Shipping condition from the customer master.
- Transportation group from the material master.
- Weight Group.
Viewed 6079 times by 1331 viewers
Related Posts
Comments
One Comment on Route Determination in SAP
-
SAP Transportation Scheduling of Sale Process | SAP Online Training, SAP SD and CRM on
Sat, 6th Mar 2010 11:18 pm
[...] • The transportation lead-time is the time in days that is needed to organize the shipping of the goods. This might include booking a ship and reserving a truck from a forwarding agent. It is defined for a route. [...]
Tell me what you're thinking...
and oh, if you want a pic to show with your comment, go get a gravatar!















